Information Being sure to meet all national (NEC), regional and local electric codes required for the location, incoming wiring should be brought into the fan through the bottom or sides of the metal shutter housing.
Information Connect the fan to a standard 120V power supply (refer to Figures 9A & 9B). The fan will not energize until the speed control in the filter compartment is turned on.
Information All units are wired for a single point electrical connection to the fan and electric heater (if equipped). Electric heaters provided by Carrier are balanced by kW per stage.
Information Only approved, qualified personnel familiar with the assessment of hazards and risks associated with fans, and with the use of tools and test equipment required to service such fans, should install,
Information The devices are constructed in accordance with the general requirement in EN 61800-2 for adjustable speed electrical power systems and is intended for one-quadrant drives.
Information Review the wiring diagram attached to the inside of the control enclosure cover to verify the field wiring is correct with proper gauge wire, overcurrent protection and properly grounded.
Information Never pressurize any equipment beyond specified test pressures listed on the unit rating plate. Always pressure test with an inert fluid or gas such as clear water or dry nitrogen to avoid possible damage
Information A complete library of Greenheck Installation, Operation and Maintenance Manuals. Use our serial number search to find the literature you need for your equipment.
Information Use caution and follow OSHA or SMACNA installation guidelines. The Fan Powered Air Terminal should be suspended from the building structure in a horizontal plane with the two bottom access panels
Information 1) The document describes the wiring circuit for controlling a lamp, fan, and external device socket using a switch box. Materials like lamps, switches, wires, and tools are listed.
Information Plug the control and power wires into the motor. The connectors are keyed and will only go in one way note: For PSC motors, pass the wires through the side of the unit back into the control panel and
Information OSITIVE RESSURE ENTILATION OUT OF THE BOX After unpacking your fan there are a couple of things you will need to do. First, add fuel and oil. Oil amounts and specifications are listed in the
Contact us today for product inquiries, custom assemblies, or technical support